Edition & replacement
Match the standard number and year to your project.
Technical requirements of dry process cement production complete equipment—Part 8:Crushing and pre-blending system
GB/T 35150.8-2026 新型干法水泥生产成套装备技术要求 第8部分:破碎与预均化系统
Need another edition? Match the full code and year to your project before ordering. Search editions
This document specifies the composition, technical requirements, safety and environmental protection, installation, acceptance and commissioning, performance testing and delivery documents of the crushing and pre-blending system (hereinafter referred to as the "complete equipment") of dry process cement production complete equipment. This document is applicable to the design, manufacture and acceptance of crushing and pre-blending systems for raw materials and fuels in dry process cement production complete equipment.
English introduction is available from the synchronized standard record.
A verified table of contents is not published for this record. Request the contents for the exact edition before deciding whether it covers your needs.
Request table of contentsFirst pages only, up to 5 per language. Select a page to preview it here, browse other pages, or switch languages when available.
Request a sample or availability checkFirst pages only, up to 5 per language. Select a page to preview it here, browse other pages, or switch languages when available.
Request a sample or availability checkMatch the standard number and year to your project.
Confirm the available language and document scope.
Review the delivery estimate and order support details.
This is an English Translation PDF. The Chinese original and issuing authority remain the reference for the standard.
Yes. Include the complete code and year in your inquiry, together with your language and delivery requirements.
Have your order reference and standard code ready. Read ordering help for payment, delivery and support information.
Send the standard code and your language requirements.